A kitchen or bathroom out of action is the part that actually hurts — not the design choices, the weeks without a working sink or shower. What determines how long that lasts is the order the trades go in: plumbing and electrics first-fixed before a single tile goes up, not worked around afterwards. Get that sequence wrong and a two-week job turns into a month of takeaways and boiling kettles for a wash.
First Fix Before Finishes
Plumbing and electrics go in and get tested before any tiling starts, so nobody's channelling out a wall that's already been tiled. The same people who did the first fix come back for the finish, so nothing's guessed at from someone else's notes.
- Water and power isolated safely before work begins
- Plumbing and electrics first-fixed before any tiling starts
- Same team for first fix through to final fit
- Extraction, taps and fittings tested before we leave
Bathrooms Run The Same Way
A bathroom follows the same order as a kitchen: water and power isolated, first-fix plumbing and electrics in and tested, then tiling, then the fit-out. The people who did the first fix are the ones who come back to finish it.
Getting that sequence right is what decides how long you're without a shower, rather than how the room looks on the last day.